record timeline for the extension of the swissklinik in pfäffikon sz

Interior fittings and air-conditioning technology, from planning to installation, all from a single source. This allowed a very short project duration of only 6 months for the complete tenant fit-out!


Creative and optimally functioning solutions are created when our specialists work closely with customers and partners in the early project development stage. Our thanks go to Markus Sennhauser, building consultant and Davide Grecco, building services planner from sem solutions ag, as well as Dario Gantner, construction management from EDA AG.


Maximum indoor climate comfort combined with functional and attractive interior design. Fresh air flows out of one wall and forms a lake of fresh air that spreads throughout the entrance hall and the corridor. There is absolutely no requirement for ventilation ducts. This is a benefit for the interior design. Connector fans in walls and doors provide fresh air for the adjacent treatment rooms. The air movements are hardly noticeable and operation is extremely quiet and comfortable. Heating and cooling is provided by vertical Rio-Therm units. In addition, UV-C tubes are integrated in these free-standing, convective units to reduce the viral load. The waste heat from the IT is used by the Cool-Rack system.



Previous project

|

Next project

|

Overview

May I help?
Christoph Diem

Christoph Diem

Head of Climate Systems
Dipl. Ing. FH

E-Mail: cdiem@erichkeller.com

Phone: +41 71 644 88 47