FAIR
For the FAIR accelerator facility in Darmstadt, one of the largest research construction projects in the world, the control and monitoring centre was created.
- Solution
- Workplace Solutions
- Project type
- Control centre & control room
- Year
- 2026
- Location
- Darmstadt
From here, the 1.1-kilometre ring accelerator and the heavy-ion research are monitored and controlled. 25 control centre desks of the D-Com model with Cool-Top 25 are in use, as well as side tables and special tables.
- Industry
- Education & research
- Products
- Control centres
- Architect
- agn Niederberghaus & Partner GmbH