zurich central station, south-west wing

Rio-Therm as the predestined solution in a listed building. The room air conditioning units, which are matched to the architecture, cool and heat all year round if required. In addition to fulfilling the requirements of the preservation order, this project also had to meet high technical demands, such as increased performance and the inclusion of various installations in the device. A total of 31 units in four completely different designs were installed on the three floors.



Previous project

|

Next project

|

Overview

May I help?
Christoph Diem

Christoph Diem

Head of Climate Systems
Dipl. Ing. FH

E-Mail: cdiem@erichkeller.com

Phone: +41 71 644 88 47